EFFECTIVE
OCTOBER 1, 2004
|
RES.
#140-04 |
|
RESIDENTIAL:
Service Charge
(PER DWELLING UNIT) |
(As Applicable) |
|
Water |
Sewer |
|
$8.28 |
$6.41 |
|
Commodity Charge
(PER UNIT OF WATER USED)
(1
unit = 100 cu ft or 748 gallons) |
|
0-8
Units |
8=$ |
8=($) |
$0.96 |
$1.88 |
|
$1.19 |
$1.88
(up to 16 units) |
|
9-16 Units |
7=$ |
15=($) |
|
17-36
Units |
20=$ |
35=($) |
$1.42 |
N/A |
|
37-76
Units |
40=$ |
75=($) |
$1.66 |
N/A |
|
77-200
Units |
125=$ |
200=($) |
$1.91 |
N/A |
|
201 and
above. |
$2.14 |
N/A |
|
 |
|
GENERAL
SERVICE: |
|
Service
Charge
(Based on Meter
Size) |
Water |
Sewer |
|
5/8 Inch |
$8.28 |
$6.41 |
|
3/4 Inch |
$12.43 |
$9.60 |
|
1 Inch |
$20.71 |
$16.02 |
|
1 1/2
Inch |
$41.45 |
$32.01 |
|
2 Inch |
$66.31 |
$51.21 |
|
3 Inch |
$124.35 |
$96.03 |
|
4 Inch |
$207.25 |
$161.23 |
|
6 Inch |
$414.50 |
$320.06 |
|
8 Inch |
$663.19 |
$512.12 |
|
10 Inch |
$953.35 |
$736.17 |
|
12 Inch |
$1,780.28 |
$1,377.24 |
|
Commodity
Charge
(PER UNIT OF WATER USED)
(1
unit = 100 cu ft or 748 gallons) |
|
0-8 Units |
$0.96 |
$1.88 |
|
9- 15
Units |
$1.19 |
$1.88 |
|
16-35
Units |
$1.42 |
$1.88 |
|
36-75
Units |
$1.66 |
$1.88 |
|
76- 200
Units |
$1.91 |
$1.88 |
|
201 and
above. |
$2.14 |
$1.88 |
|
 |
|
IRRIGATION: |
|
Service
Charge (Same as above) |
|
Commodity
Charge
(PER UNIT OF WATER USED)
(1
unit = 100 cu ft or 748 gallons) |
|
0-
75
Units
|
$1.66 |
N/A |
|
76-
200 Units
|
$1.91 |
N/A |
|
$2.14 |
N/A |
|
201
and above. |
 |
|
WITHOUT
CITY WATER:
Sewer commodity charge is $30.08 per dwelling
unit/equivalent unit |
|
INACTIVE
ACCOUNTS:
Is equal to the Service Charge as listed for
residential and non-residential accounts |
|

|
|
SURCHARGE:
A 25% surcharge will be added to all rates.
fees and charges to those customers outside
City of WPB limits per City Resolution.
|
|
MISCELLANEOUS
CHARGES AND FEES |
| EFFECTIVE
OCTOBER 1, 2004 |
|
UD219
(rev 10-04)
RES. #140-04 |
|
EFFECTIVE APRIL 1, 2004 |
Res. #140-04 |
|
MINIMUM
DEPOSITS REQUIRED |
|
Meter
Size |
Residential |
General Srvc. |
|
5/8 |
$145 |
$175 |
|
3/4" |
$220 |
$275 |
|
1" |
$360 |
$525 |
|
1
1/2" |
$725 |
$1,030 |
|
2" |
$1,160 |
$1,650 |
|
3" |
$2,175 |
$3,300 |
|
4" |
$3,625 |
$5,150 |
|
6" |
$7,250 |
$10,350 |
|
8" |
$11,600 |
$16,600 |
|
10" |
$16,675 |
$23,975 |
|
12" |
$31,175 |
$37,625 |
|
Fire
Hydrant Meter Deposit
$1,300 |
|
Detector
Check Meter Deposit
$50 |
|
WATER & WASTEWATER |
|
SYSTEM |
CAPACITY |
CHARGES |
|
Meter
Size |
Water |
Wastewater |
|
5/8" |
$1,270 |
$940 |
|
3/4" |
$1,905 |
$1,410 |
|
1" |
$3,175 |
$2,350 |
|
1
1/2" |
$6,350 |
$4,700 |
|
2" |
$10,160 |
$7,520 |
|
3" |
$20,320 |
$15,040 |
|
4" |
$31,750 |
$23,500 |
|
6" |
$63,500 |
$47,000 |
|
8" |
$101,600 |
$75,200 |
|
10" |
$146,050 |
$108,000 |
|
12" |
$273,050 |
$202,100 |
 |
|
PRIVATE
FIRE LINE
PROTECTION SERVICE
(BILLED MONTHLY) |
| Size |
Deposit |
Monthly |
| 2" |
$50 |
$14.08 |
| 2
1/2" |
$65 |
$22.01 |
| 3" |
$75 |
$26.41 |
|
4" |
$125 |
$44.01 |
|
6" |
$195 |
$88.02 |
|
8" |
$410 |
$140.84 |
|
10" |
$590 |
$201.43 |
|
12" |
$700 |
$363.82 |
|
Detector
Check $50 Deposit |
|
|
Service
Initiation Charge |
up
to 1" |
$40.00
|
| |
over
1" |
$60.00
|
|
Collections
Disconnect Charge |
up
to 1" |
$50.00 |
| |
over
1" |
$80.00
|
|
Meter
Re-reads & Special Reads |
$25.00
|
|
Returned
Check Charge |
$25.00
|
Field
Visit Charge |
|
|
| During
Normal Working Hours |
|
$25.00
|
| After
Normal Working Hours |
|
$40.00
|
|
Meter
Test Charge
- up to 1 inch |
$60.00
|
|
Meter
Test Charge
- 1 1/2 inch & 2 inch
|
$125.00
|
|
Meter
Test Charge
- 3 inch and greater |
$310.00
|
| For
Plan Review and Construction Fees
contact Public Utilities Engineering
at 561-659-8040 |
Sewer
Lateral Installation Charge: |
$920.00 |
Sewer
Tap Inspection Only |
|
$95.00
|
|
Late
Payment Fee: |
$2.00
or |
|
1%
of unpaid balance of each service
agreement, whichever
is greater
|
|
Fire
Hydrant Meter Installation |
$155.00
|
|
|
RAW WATER IRRIGATION |
| |
Rate
for Service |
| Revocable
Permit Required |
$50.00 |
|
Residential |
$12.00
monthly |
General Service
(must be metered) |
25%
of the currently effective potable
water irrigation rate based on usage |
|
|
INSTALLATION |
| |
*Contractor |
City |
| Meter
Size |
Install
Charge |
Tap-In
Charge |
|
5/8" |
$350 |
$660 |
|
5/8"
DC |
$80 |
N/A |
|
3/4" |
$350 |
$660 |
|
1" |
$455 |
$885 |
|
1
1/2" |
$785 |
$1,430 |
|
2" |
$865 |
$1,535 |
|
**3" |
$2,245 |
***N/A |
|
**4" |
$2,680 |
***N/A |
|
**6" |
$4,150 |
***N/A |
|
**8" |
$9,745 |
***N/A |
|
**10' |
$13,755 |
***N/A |
|
**12" |
$16,745 |
***N/A |
|
All plans must be preapproved
by Utilities
Engineering 561-494-1040
Contractor
Installed Private Firelines $515.
**This
is estimated charge,
FINAL charge is
determined by actual costs.
***Customers are responsible for installing
all 3" and larger services. |
|
|
|
|
 | |